I have not found a description of this deposit.

Crespo project located in southern Peru, approximately 145 kilometres southwest of Cuzco and 587 kilometres southeast of Lima.

The project is one of a number of properties acquired by the Hochschild Mining in 2008 as part of the Liam JV/Southwestern Resources land package.

The Project is located on the western slopes of, and on the continental divide of the Cordillera Occidental (Western Cordillera) of the Peruvian Andes. The area is well above tree line in the Altiplano which is an undulating high altitude plain of gentle to moderate slopes with elevations ranging from a high 5,371 m on Cerro Crespo.

The San Jose silver-gold mine is located in Argentina, in the Santa Cruz province, 1,750 kilometres south-southwest of Buenos Aires. The property covers a total area of 50,491 hectares and consists of 46 contiguous mining concessions totalling 40,499 hectares and an exploration permit covering almost 10,000 hectares. The San Jose property is located approximately 20 kilometres north of Goldcorp’s Cerro Negro project.

Inmaculada is a 20,000 hectare two-third gold and one-third silver mine consisting of 40 mining concessions located in the Ayacucho Department in southern Peru. Inmaculada is 112 kilometres from the Pallancata operation.

The Pallancata silver/gold deposit is located in the Department of Ayacucho in southern Peru, approximately 160 kilometres from the Arcata operation. Pallancata commenced production in 2007 and up until December 2013 was a joint venture, in which Hochschild held a controlling interest of 60% with International Minerals Corporation (“IMZ”). Following the purchase of IMZ, Hochschild now owns 100% of the operation. Ore from Pallancata is transported 22 kilometres to the Selene plant for processing.

The Arcata unit is located in the Department of Arequipa in southern Peru, approximately 300 kilometres from the city of Arequipa, on a 47,000 hectare site, at an altitude of 4,600 metres above sea level. Arcata is a 100% owned underground operation. The Company began developing and preparing the Arcata mine in 1961 and the first concentrate was poured in 1964.

The Donlin deposits are situated approximately 280 miles (450 km) west of Anchorage and 155 miles (250 km) northeast of Bethel up the Kuskokwim River. The closest village is the community of Crooked Creek, approximately 12 miles (20 km) to the south, on the Kuskokwim River.

Altar is a copper-gold property in San Juan province, Argentina. It is located in the Andes Mountains, approximately 10 km from the Argentina-Chile border, and approximately 180km west of the city of San Juan.